User Manual
Version 7.5
×

Equipment Work on Days

 
Equipment operation by day report shows object , moving time , parking time , working time , working time parking time , ignition time , vacation time. etc
 
The report contains:
Object - the object of monitoring.
Duration of moving - the time during which the monitoring object was in motion. The minimum speed at which an object is considered to be moving is set in the object properties on the Settings tab.
Duration of parking - the total parking time of the facility per day. The time from which it is considered that the object has stopped is set in the properties of the object on the Settings tab.
Duration of work - equal to the sum of the time in motion and the time of stops during working hours.
Duration of parking in work time - the total time of stops of the facility per day. The minimum time after which the object is considered to have stopped is set in the object properties on the Settings tab (Min. parking time parameter).
Time the  Ignition - time during which the ignition was turned on.
Vacation time - equal to the difference between 24 hours and working time on the line.
Distance - mileage of the monitoring object in 24 hours.
Avg. speed - average speed of the monitoring object.
 
If necessary, you can disable certain parts of the report by clicking on the icon, when pressed, a menu opens where you can disable / enable certain fields.